Saia-Burgess Controls AG
Bahnhofstrasse 18 I CH-3280 Murten I Schweiz
T +41 26 580 30 00 I F +41 26 580 34 99
www.sbc-support.com
Assembly and operating instructions Type AWD3B5WS
Three-phase active power bidirectional energy meter with serial S-Bus interface, Pic. 1
Description
Energy meter with serial S-Bus interface enables the reading
of all relevant data like meter reading, electricity, voltage
and power (active and reactive).
Indicating elements
(Pic. 4)
T (kWh)
■
Shows total consumption
T (kWh)
■
Shows total feeding back
CT
■
Shows the set current
transformer ratio
Select
■
The transformer ratio can be
selected in Menu item Select, with
the open bridge Z1-Z2
P(kW)
■
Shows the present output per
phase or for all phases
Current « » = supply (P positive)
Current « » = feeding back (P neg.)
U(V)
■
Shows the voltage per phase
I(A)
■
Shows the current per phase
10 Imp/kWh (only
■
Pulsates according to drawn power
for Product without MID)
kWh
■
Shows the unit kWh when the
consumption is displayed
L1 / L2 / L3
■
For P-, U-, I- or Error display, the
corresponding phase is displayed
Error
■
In case of missing phase. The cor-
responding phase is additionally
displayed.
Technical data
Connection
■
Pic. 2
diagram
Dimensions
■
Pic. 3
Accuracy class
■
B according to EN50470-3,
1 according to IEC62053-21
Reference, Maxi-
■
Iref = 5 A, Imax = 6 A, Ist = 10 mA
mum, initial current
operating voltage
■
3 × 230/400 VAC, 50 Hz
Tolerance −20%/+15%
Counting range
■
000 000,0…9 999 999 kWh
LED-Ouptut
■
10 Imp/kWh
Connections
■
Conductor cross-section 1,5−16 mm
2
,
Main circuit screwdriver pozi no. 1, slot no. 2,
torque 1,5 - 2 Nm
Connections
■
Conductor cross-section max. 2,5 mm
2
,
Control circuit screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
Operating
■
−25 … +55°C (noncondensing
temperature according standard EN50470)
Environment
■
Mechanical M2
Electromagnetic E2
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to conden-
sate build-up, acclimatise the meter at room temperature
for about half an hour before connecting.
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of re or the risk of
an electric shock.
Declaration of Conformity CE
We, Saia-Burgess Controls AG, CH 3280 Murten (Switzer-
land), herewith declare, on our own responsibility that
the products:
■
AWD3B5WS00C3A00
which this certicate refer to, are in accordance with the
directive 2004/22/EG (MID) and the following standards:
■
EN50470 parts 1 and 3 (electronic meter), of
October 2006.
Murten, 30.04.2013
Conformity Assessment Body:
METAS-Cert, Nr. 1259
CH-3003 Bern-Wabern
Signed: Urs Tanner, Site Quality Leader
English
Installation instructions
The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
4 319 5130 0E 03.2017 Subject to change without notice
R Read Write Description Value / Unit
0
X
Firmware-Version Ex: „11“= FW 1.1
1
X
Number of supported registers will give „41“
2
X
Number of supported ags will give „0“
3
X
Baudrate BPS
4
Not used will give a „0“
5
X
ASN (letter 1-4) will give „AWD3“
6
X
ASN (letter 5-8) will give “B5WS”
7
X
ASN (letter 9-12) will give “00Cx”
x : 2 = Non MID
x : 3 = MID
8
X
ASN (letter 13-15) will give “A00”
9
X
HW Vers. Modif Ex: „11“= FW 1.1
10
Not used will give a „0“
11
X
Serialnumber will give the serialnumber High
12
X
Serialnumber will give the serialnumber Low
13 Not used will give a „0“
14
X
Status „0“ = no Problem
„1“ = Problem with last communication request
15
X
S-Bus Timeout ms
16
X X
S-Bus Address
17
X
Error Flags 0 : No error
1 : Error Phase 1
2 : Error Phase 2
3 : Error Phase 1 and 2
4 : Error Phase 3
5 : Error Phase 1and 3
6 : Error Phase 2 and 3
7 : Error Phase 1, 2 and 3
18
X
Current transformer ratio Ex: Transformer 100/5 give „20“
19
X
Not used will give a „0“
20
X
Counter total «energy consumption»
10
-1
kWh. (multiplier 0,1)
Ex: 00912351= 0091235,1 kWh
21
X
Counter total «energy feeding back»
10
-1
kWh. (multiplier 0,1)
Ex: 00912351= 0091235,1 kWh
22
Not used will give a „0“
23 Not used will give a „0“
24
X
URMS phase 1
Eective Voltage of Phase 1
V
Ex: 230 = 230 V
25
X
IRMS phase 1
Eective Current of phase 1
A / Except. 5/5 = 10-1 A
Ex: 145 = 145 A
26
X
PRMS, phase 1 positive: Energy “ “
Eective, phase 1 negative: Energy “ “
10
-1
kW (multiplier 0,1)
Ex: 1545 = 154,5 kW
27
X
QRMS phase 1
Eective reactive power of phase 1
10
-1
kVAr (multiplier 0,1)
Ex: 1545 = 154,5 kVAr
28
X
cos phi phase 1 10
-2
(multiplier 0.01)
Ex: 67 = 0.67
29
X
URMS phase 2
Eective Voltage of Phase 2
V
Ex: 230 = 230 V
30
X
IRMS phase 2
Eective Current of phase 2
A / Except. 5/5 = 10-1 A
Ex: 145 = 145 A
31
X
PRMS, phase 2 positive: Energy “ “
Eective, phase 2 negative: Energy “ “
10
-1
kW (multiplier 0,1)
Ex: 1545 = 154,5 kW
32
X
QRMS phase 2
Eective reactive power of phase 2
10
-1
kVAr (multiplier 0,1)
Ex: 1545 = 154,5 kVAr
33
X
cos phi phase 2 10
-2
(multiplier 0.01)
Ex: 67 = 0.67
34
X
URMS phase 3
Eective Voltage of Phase 3
V
Ex: 230 = 230 V
35
X
IRMS phase 3
Eective Current of phase 3
A / Except. 5/5 = 10-1 A
Ex: 145 = 145 A
36
X
PRMS, phase 3 positive: Energy “ “
Eective, phase 3 negative: Energy “ “
10
-1
kW (multiplier 0,1)
Ex: 1545 = 154,5 kW
37
X
QRMS phase 3
Eective reactive power of phase 3
10
-1
kVAr (multiplier 0,1)
Ex: 1545 = 154,5 kVAr
38
X
cos phi phase 3 10
-2
(multiplier 0.01)
Ex: 67 = 0.67
39
X
PRMS, total positive: Energy “ “
Eective, total negative: Energy “ “
10
-1
kW (multiplier 0,1)
Ex: 1545 = 154,5 kW
40
X
QRMS total
Eective reactive power of all phase
10
-1
kVAr (multiplier 0,1)
Ex: 1545 = 154,5 kVAr
Technical data S-Bus
Bus system S-Bus
Transmission rate 4800-9600-19 200-38 400-57 600-115 200.
The transmission Baud rate is automatically detected
Transmission mode Data
Bus length (max.) 1200 m (without repeater)
Response time: Write: 60 ms
Read: 60 ms
■
The interface works only if the phase 1 is connected
■
The communication is ready 30 s after the power on
■
The use of Energymeter in bus with intensive communication could reduce the performance of the bus
■
Refresh time for the data is 10 s. For this reason one energy meter should be not polled faster as 10 s
■
254 Devices could be connected to the S-Bus. Over 128 devices, a repeater should be used
■
The interface don’t have a terminal resistor, this should be provided external
■
For a description of the used registers please look at the register page
Data transmission
■
Only «read/write» register instructions are recognized
■
Only one register can be written at a time
■
The device will respond „NAK“ if more than 1 register is written
■
Up to 10 Registers could be read at a time
■
The device will respond „NAK“ if more than 10 registers are read
■
The device will not respond to any unknown query
■
The device has a voltage monitoring system. In case of voltage loss, registers are stored in EEPROM
(transmission rate» etc.)
Change the S-Bus address direct on device
■
To modify the S-Bus address, press 3 s on ► touch
■
In menu, ▼ increase address by 10, ► increase by 1
■
Once the address is selected wait for the root menu to come back
English
Wiring diagram
The secondary, mains current transformer con-
nection is to be connected to the phase to be
measured and therefore the transformer don’t
have to be grounded.
This connection is to be fused according to the local instal-
lation instructions.
Method of operation (Pic. 5)
Energy is added as indicated by the arithmetic operator.
Positive output in the meter indicates that energy is being
supplied, while negative output indicates that energy is
being delivered.