To activate the test:
Press key 1 until GREEN LED 5 STARTS TO FLASH
The system will start to load the
thermoproduct/boiler
tank.
When the max probe (upper) has detected the presence of pellets, the
LOADING TEST function will be automatically deactivated.
On completion of the test, the tank is active and operational.
The system will start to load again (LED 1 FLASHING) when the minimum level sensor (MIN PROBE - LED 3) is uncovered/free
from the pellets until the max level sensor is reached (MAX PROBE LED 4) or the TIMER count has ended.
If there is no request, it remains in “LOAD STAND-BY - LED 1 ON”
SYSTEM OPERATION
If it has not been performed with “LOAD TEST”.
Press key 3 for about 3 seconds, to activate the system (LED 1 ON)
The system will start to load (LED 1 FLASHING) when the minimum level sensor (MIN PROBE - LED 3) is
uncovered/free from pellets until the max level sensor is reached (MAX PROBE LED 4), otherwise if there is no request, it
remains in “LOAD STAND-BY - LED 1 ON”.
In the event of a Black out (no mains voltage), the system behaves as described below:
If the system was in OFF mode, it returns to OFF.
If the system was in LOAD STAND-BY, it returns to LOAD STAND-BY.
If the system was in PELLET LOAD phase, it goes to PELLET LOAD.
If the system was in ALARM mode, it returns to ALARM.
MANUAL LOADING
Manual loading can be activated, even if the minimum level sensor MIN PROBE LED 3 is not uncovered/requests.
By pressing key 1 for 3 seconds, the tank can be loaded manually without controlling the lower level (MIN PROBE LED 3)
loading until the maximum level sensor is reached (MAX PROBE LED 4).
After having performed a manual load, the system will remain active while waiting for the minimum sensor level to request a
load again.
SWITCHING THE SYSTEM OFF
By operating for 3 seconds on key 3, loading will be activated and deactivated.
If the system is deactivated, the LED 1 will be o.
With the system active, LED 1 will be on with xed light.
OPERATION AND LOGIC
After having installed the pellet storage tank, follow the instructions:
Connect the power supply cable to the mains electricity.
Power the tank by taking the switch to "I".
The GREEN LED 5 will switch on indicating the presence of the power supply.
LOAD TEST (FACULTATIVE)
The company recommends performing the “LOAD TEST” before start-up. The “LOAD TEST” function must be carried out with the
thermoproduct/boiler tank empty and in OFF mode (LED 1 o).
This function automatically calculates the time necessary to ll the thermoproduct/boiler tank up to the maximum level sensor
(MAX PROBE LED 4).
In this way, whenever the upper probe should have an anomaly, the timer will stop automatic loading anyway, thus preventing
escapes.
19
ENGLISH