ADAM-4515 User's Manual
Installation
Initial inspection
We carefully inspect ADAM-4515 modules both
mechanically and electrically before shipping. They
should be free of marks and scratches and in perfect
order on receipt.
As you unpack the modules, check them for signs of
shipping damage (damaged box, scratches, dents,
etc.). If it is damaged or fails to meet our specifica-
tions, notify our service department or your local sales
representative immediately. Also, call the carrier
immediately and retain the shipping carton and
packing material for inspection by the carrier. We will
then make arrangements to repair or replace the unit.
LED operation
sutatsDELsutatsDEL
sutatsDEL
sutatsDELsutatsDELsutatseludoMsutatseludoM
sutatseludoM
sutatseludoMsutatseludoMgninaeMgninaeM
gninaeM
gninaeMgninaeM
FFOrewopoNotrewoponsierehT
5154-MADAeht
neerGnorewoPsi5154-MADA
yllamrongnitarepo
neerggnihsalFgnitareposieludoMmorfwolfataD
thgirottfelsikrowten
dergnihsalFgnitareposieludoMmorfwolfataD
tfelotthgirsikrowten
etarduaBetarduaB
etarduaB
etarduaBetarduaB
htgnelenilknurThtgnelenilknurT
htgnelenilknurT
htgnelenilknurThtgnelenilknurThtgnelporDhtgnelporD
htgnelporD
htgnelporDhtgnelporD
ecnatsidmumixaMecnatsidmumixaM
ecnatsidmumixaM
ecnatsidmumixaMecnatsidmumixaMmumixaMmumixaM
mumixaM
mumixaMmumixaMevitalumuCevitalumuC
evitalumuC
evitalumuCevitalumuC
sreteMsreteM
sreteM
sreteMsreteMteeFteeF
teeF
teeFteeFsreteMsreteM
sreteM
sreteMsreteMteeFteeF
teeF
teeFteeFsreteMsreteM
sreteM
sreteMsreteMteeFteeF
teeF
teeFteeF
s/stibK521m005tf0461m6tf02m651tf215
s/stibK052m052tf028m6tf02m87tf652
s/stibK005m001tf823m6tf02m93tf821
etarduaBetarduaB
etarduaB
etarduaBetarduaB
)mumixam(htgnelenilknurT)mumixam(htgnelenilknurT
)mumixam(htgnelenilknurT
)mumixam(htgnelenilknurT)mumixam(htgnelenilknurT)mumixam(htgnelporD)mumixam(htgnelporD
)mumixam(htgnelporD
)mumixam(htgnelporD)mumixam(htgnelporD
sedonforebmuNsedonforebmuN
sedonforebmuN
sedonforebmuNsedonforebmuN
sreteMsreteM
sreteM
sreteMsreteMteeFteeF
teeF
teeFteeFsreteMsreteM
sreteM
sreteMsreteMteeFteeF
teeF
teeFteeF
s/stibK521m2.754tf0051m6.3tf2146
s/stibK052m8.281tf006m8.1tf646
s/stibK005m4.19tf003m9.0tf346
s/tibM18.22573.0123
Cable lengths
The following provide cable length limits for DeviceNet and SDS sytems:
Network maximum lengths - DeviceNet
DeviceNet has a limit of 64 nodes per network for any baud rate.
Network maximum lengths - SDS
SDS has a limit of 32 nodes per network for any baud rate.
Network termination
A CAN-bus system must be terminated at each
end of the trunk line. The host controller and the
last CAN-bus repeater or other DeviceNet device
on the network must always be terminated to
eliminate reflections, even if only two nodes are
present. Follow the information below when using
an ADAM-4515
Trunk line use:
For the purpose of network termination, the
ADAM-4515 is treated as the last node on the
section of the trunk network to which it is
connected. Therefore, when an ADAM-4515 is
used directly in a trunk line, it must be
terminated on both the Network A and Network B
sides. You must also place a terminating resistor
on the other end of the device of Network A and
on the last device on the Network B side of the
trunk line.
Drop line use:
When the ADAM-4515 is used in a drop line (with
the Network A side towards the main trunk), the
Network A connection is not terminated. The
Network B side is now considered as an
independent bus line electrically. The ADAM-
4515, as the first node in this new bus line, must
be terminated and the last device on the line
must also be terminated.