Arizona Shower Door Tycson Series Installation Instructions Manual

Tipo
Installation Instructions Manual
Tools you will need for this install
Exploded View drawing of shower door
3/16” Masonry drill bit (use 9/64” drill
bit for fiberglass)
1/8” drill bit
Drill
4’ Level
Saw (Electric Chop saw or Hacksaw)
Side cutting pliers
#2 Phillips drill bit
#2 Phillips screwdriver
Tape Measure
Pencil or Pen
Caulking Gun
1-Tube of 100% Clear Silicone (no latex!)
Vacuum Cleaner or Brush for clean up
Glass Cleaner and Paper Towels
Rubber Mallet
File
Arizona Corporate Office
2801 W. Indian School Rd
Phoenix, AZ 85017
800-255-1901 PH
602-447-8208 FAX
Florida
8100-1 Westside Industrial Dr
Jacksonville, FL 32219
855-695-8899 PH
904-786-9025 FAX
Illinois
2601 Bond St #1
University Park, IL 60484
800-861-6120 PH
708-235-0729 FAX
Oregon
2057 Lars Way
Medford. OR 97501
866-773-7905 PH
541-773-7909 FAX
Colorado
3871 Revere Street
Denver, CO 80239
866-574-1766 PH
303-574-1775 FAX
Utah
2594 S. 3600 West Suite A
West Valley City, UT 84119
877-402-5007 PH
801-972-3111 FAX
1) Installing Dam Strip and Wall Jamb.
Find the centerline of where the unit will be
installed. This will usually be the center of the
curboftheshowerpan.
(A)Placeacenterline
markateachendofthecurbwhereitmeets
thewall. Thismarkwillalsorepresent thecen‐
terofthedamstripZD1026(#1)andwalljamb
ZD1006(#2).Measurewalltowalldistanceon
top of the curb where the door is going to sit.
Cut the ZD1026 to this dimension.
(A2) Run a
beadofsiliconeunderneathitthensetinplace
accordingtothemarksyoumade.Usetapeto
holdinplace,preferablybluetape.Thiswillse‐
cure it in place until installation is complete.
Next, place the wall jamb against the wall on
the door side of opening and on top of the
ZD1026. Make sure to leave a 1/16” gap be‐
tween the outside edge of the wall jamb and
the inside lip of the dam strip to allow for the
installationofthedoor.
(B)Usealeveltoposi‐
tion the jamb plumb and mark the pre‐drilled
holeswithapenorpencilSetthejambaside
anddrill the 3 holes using a 3/16” masonrybit
(Note:forfiberglassuse9/64”bitwithoutusing
anchors).
(C)Insertthe(3)screwanchors
ZV935(#18) into theholes. Fasten the ZD1006
walljambinplaceusingthe(3)‐#8X1‐1/4(#16)
PhillipsPanHeadscrewsprovided.

Installation Instructions
for
Model - Tucson
Note:Theseinstructionswillrefertotheitem#’sintheExplodedViewdrawing.Forexample,#1,#2,#3etc…
Pleasereadthroughalloftheinstructionstogetanover‐viewbeforeyouinstalltheshowerdoor.
1/16”
Gap
2)
CuttingandInstallingtheZSS4104Base
U‐Channel(#4)andWallU‐Channel(#3).
Note:The basechannel comeswith a pre‐
appliedadhesivetape.
Measure the size of the fixed panel glass.
Withthesemeasurements,determinethe
lengthsoftheZSS4104U‐channelsbyusing
theguidelinesontheright.Aftercuttingthe
channel to the proper lengths, remove the
protectivefilmfromthetapeandplacethe
basechannelontopofthedamstripatthe
desiredlocationofthefixedpanelwiththe
outside edge of the u‐channel against the
lip of the dam strip (Note: No gap is re‐
quiredwithu‐channel.)(D)Thepre‐applied
tape will secure the channel in place until
theunitissealed.Toinstallthewallchan‐
nel, first drill three (3) 3/16” holes, one in
the center and one on each end approxi‐
mately6”fromtopandbottomofthewall
channel.Theseholeswillbeusedtosecure
the channelto the wall. Set the wallchan‐
nel on top of the base channel. Use the
sameprocedure as abovewiththe ZD1006
toinstalltheZSS4104wallchannel.(E)Use
a level to position the channel plumb and
marktheholeswithapenorpencilSetthe
u‐channel aside and drill the holes using a
3/16masonrybit(Note:forfiberglassuse
9/64”bitwithoutusinganchors).(F)Insert
the screw anchors ZV935 (#18)intothe
holes.Fastenthewallchannelinplaceusing
the (3)‐#6X1‐1/4 (#17) Phillips Flat Head
screwsprovided.
(#3)WallChannelSize=FixedPanelHeight
7/16”
(#4)BaseChannelSize=FixedPanelHeight+5/16”
Note:Thebasechannelwillbeinstalledtighttothewallandthe
wallchannelwillsitontopofthebasechannel.
3)
Settingthefixedpanel. Once the base
and wall u‐channel are installed,place two
setting blocks PSB125/PSB250 (#15)inside
the base channel. Place the fixed panel
glassinsidetheu‐channelaligningthepanel
flush with the open side of the base chan‐
nel.Usealeveltomakesurefixedpanelis
setplumbandlevel.(G)
4)InstallingtheStrikeJamb.
Note:StrikejambZVP043884(#21)comes
assembled with magnet MAG4014 (#22)
andstrikesealvinyl ZVP04SEAL84 (#20)al‐
ready installed. Clear tape is used to hold
them in place until installation. Remove
tape after strike jamb installation is com‐
plete.Thestrikejambisdesignedtobeat
tached to the fixed panel so that the door
opens out only. When installing the strike
jamb, the magnet should be facing toward
youasyouarestandingontheoutsideof
theshowerlookingin.Themagnetistobe
centered with the handle on the door.
Thereisanotchrequiredatthebottomof
thestrikejambinordertoaccommodate
the u‐channel. (H)Useahacksaworside
cuttingplierstocutthenotch.Ifnecessary,
useafiletocleanup anysharp edges. The
strikejambis designedtosit ontopof the
dam strip and run the full height of the
fixedpanel.Afternotchingthestrikejamb,
slideit overtheedgeoftheglassuntilitis
fullyseated.
**OptionalFlushCut:Strikejambcanbeflush
cuttodoorheightifdesired.Thiscanbedone
afterdoorisinstalledandfinisheddoorheight
isdetermined.
5)
Attaching the Door. Slide the ZD2505A
(#3)hingejambovertheZD1006walljamb.Do
notfastenthedooratthispoint.Please note:
It will be helpful to have an assistant at this
pointtoadjustandholdthedoorinplacefrom
theoutsidewhileyoudrillandfastenthehinge
jambfrom theinside.Squareup the door and
aligntheedgeofthedoorglassparallelwiththe
strike jamb, leaving a 1/8” gap between the
two.
(I) Attach the door by drilling the three
holesontheinsideofthe unitwherethejamb
is pre‐drilled using an 1/8” drill bit and secure
with the (3)‐#6 x 3/8” (#19) Pan head screws
provided.
(J)
6) Attaching the CYLP8X8 Handle (#25).
Take the two stud head mounting screws and
sleeve one clear washer on each screw. Next,
insertthecleargrommetsintotheholesinthe
door. From the outside of the door, push the
thread of the screws through the grommets in
theholesintheglass.Ontheinsideofthedoor,
sleeveaclearwasherontothescrews.Takethe
pullthat has thethreaded hole in the end and
begin to thread the top screw into it and then
thebottomscrew.Tightenthestudheadscrews
down with a screwdriver (not a drill). This pull
will be on the inside of the door. Place there‐
mainingpull,withthelargeholesandsetscrew,
ontothestudheadsofthescrews.Tightenthe
setscrewswithAllenwrenchprovided.
(K)
OutsideView
InsideView
Next,attach the magnet catch MAG4012 (#24)
by placing ZV916 (#23)vinylovertheedgeof
theglassthentappingcatchoverthegasketand
ontotheglasswitharubbermalletaligningitto
themagnetonthestrikejamb.
(L)
7) Installing optional Finish Caps.
Placeasmallamountsiliconeonthelegsof
the ZV940 Door Clip (#13) and place it
downintothetopoftheZD1006tocapthe
opening.Youmayhavetotrimthemtofit
with side cutting pliers. (M) Use the same
procedure to install SDCEC38 (#26)tocap
thetopoftheZSS4104wallu‐channel.
8)
InstallingtheBottomPolyRail
Note:Ifthedoorwasorderedhingespe
cific, this step may already be done. If so
skiptostep7.Cuttolengthandnotchthe
BottomPolyRailZVP14WS(#14),thenpush
it over the bottom edge of the glass (N).
Run a small bead of silicone on the inside
wherethemetalandpolymeettoprevent
waterseepingoutoftheenclosure
9)
SealingtheEnclosure.Run abead of sili‐
cone on the inside and outsidewhere thewall
jamb meets the shower wall and where the
dam strip meets the curb. Inspect the install
andcaulkanygapthatmightletwaterthrough.
Then run a small bead (inside and out) where
theglassmeetstheU‐channel,aswellaswhere
thechannelmeetstheinstallationsurface.
(O)
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7

Arizona Shower Door Tycson Series Installation Instructions Manual

Tipo
Installation Instructions Manual

in altre lingue