CARLO GAVAZZI EM24DINAV23XE1PFB Manuale utente

Tipo
Manuale utente
EM24 E1
USER MANUAL
MANUALE UTENTE
BETRIEBSANLEITUNG
MANUEL D’EMPLOI
INSTRUCCIONES DE USO
BRUGERMANUAL
EN ITDA ES FR DE
EM24 E1
Three-phase energy analyzer
USER MANUAL
3EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Contents
EM24 E1 4
Introduction 4
Description 4
UCS (Universal Conguration Software) 4
EM24 E1 use 5
Introduction 5
Display 5
Network parameters setting 6
Setting network parameters via DHCP 6
Setting network parameters without DHCP 6
Working with EM24 E1 7
Working with the measurement/info menu 7
Working with the settings menu 7
Resetting partial energy meter 7
Setting a parameter 8
Menu description 9
Measurement menu - measurement pages 9
Information Menu 10
Settings from EM24 E1 11
General settings 11
Essential information 12
Applications 12
Programming pages 13
Managing taris via Modbus command 14
Disabling tari management 14
Frontal LED 14
Frontal selector 14
Maintenance and disposal 15
4 EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Information property
Copyright © 2018, CARLO GAVAZZI Controls SpA
All rights reserved in all countries.
CARLO GAVAZZI Controls SpA reserves the right to apply modifications or make improvements to the relative documentation
without the obligation of advance notice.
Safety messages
The following section describes the warnings related to user and device safety included in this document:
NOTICE: indicates obligations that if not observed may lead to damage to the device.
CAUTION! Indicates a risky situation which, if not avoided, may cause data loss.
IMPORTANT: provides essential information on completing the task that should not be neglected.
General warnings
This manual is an integral part of the product and accompanies it for its entire working life. It should be consulted for all
situations tied to configuration, use and maintenance. For this reason, it should always be accessible to operators.
NOTICE: no one is authorized to open the analyzer. This operation is reserved exclusively for CARLO GAVAZZI technical
service personnel.
Protection may be impaired if the instrument is used in a manner not specified by the manufacturer.
Service and warranty
In the event of malfunction, fault, requests for information, contact the CARLO GAVAZZI branch or distributor in your country.
Installation and use of analyzers other than those indicated in the provided instructions void the warranty.
Download
This manual www.productselection.net/MANUALS/UK/EM24_im_use.pdf
Installation instruction - EM24 www.productselection.net/MANUALS/UK/EM24_im_inst.pdf
UCS software www.productselection.net/Download/UK/ucs.zip
5EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpAEM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
EM24 E1
Introduction
EM24 is a three-phase energy analyzer for DIN-rail mounting, with configuration joystick, frontal selector and LCD display.
The direct connection version (AV2) allows to measure up to 65 A, the CT connection version (AV5) allows to measure up to 34875 A by
means of current transformers (5 A secondary output).
The DHCP function is able to speed the commissioning and all the configuration parameters can be set up via UCS.
Description
AV2 AV5
Part
Description
A LCD display
B Voltage/current connections
C Joystick
D Selector with pin for MID seal (programming block)
E Inputs/outputs or communication port
F Pins for MID seal (protection covers included)
UCS (Universal Conguration Software)
UCS desktop is available for free download. It can be connected to EM24 via Ethernet (Modbus TCP/IP) .
The following is possible with UCS:
configure EM24 (online or offline)
view system status for diagnostics and configuration checks function overview
6 EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
EM24 E1 use
Introduction
EM24 is organized in two menus:
measurement and information menu: pages used to display the measurement pages, information relevant to the programmed parameters
and instrument firmware release
settings menu: pages used to set parameters
Display
The display is divided into 3 lines.
Symbol Description
Displaying of phase-to-neutral system voltage
Displaying of phase-to-phase system voltage
Displaying of max values
User ID
Displaying of system variables
Displaying of dmd variables
EEEE
Overflow.
Note: the DMD calculation, the hour-counter and the
energy meters functions are inhibited and the alarm
outputs are activated. The indication “EEEE” in a single
phase variable automatically implies the overflow condi-
tion of the relevant system variable, and the PF indica-
tion is forced to “0.000”.
7EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpAEM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Network parameters setting
Setting network parameters via DHCP
Step Action
1 Install EM24
2 Enable DHCP and exit with End
3 Connect the EM24 to the LAN network to which the PC is connected
4 Access the Info pages to view the assigned network parameters
5 Start UCS software and connect to EM24 via Manual connection> Modbus TCP
6 Enter the IP address displayed on the Info page (see point 4)
7 Access the settings, disable DHCP and assign the required network parameters (assigned by network administrator)
Setting network parameters without DHCP
Step Action
1 Install EM24
2 Disable DHCP (default setting)
3 Connect the PC to the EM24 via Ethernet cable (point to point connection)
4
Set the PC network properties as follows:
static IP address
IP address of the same class as the EM24, e.g. if the IP of EM24 is 192.168.1.10 (default), you can set the PC address to
192.168.1.20
Subnet mask: 255.255.255.0
Gateway: not necessary
5
Start UCS software and connect to EM24 via Manual connection> Modbus TCP, enter the EM24 IP address
(192.168.1.10 by default)
6 Access the settings and enter the required network parameters
7 Disconnect the Ethernet cable and connect the EM24 to the network to which the Modbus master is connected
8
EM24 E1 use
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Working with EM24 E1
Working with the measurement/info menu
Working with the settings menu
Resetting partial energy meter
Step Action Button
1 Press the button for at least 3 seconds
2 In the PASS page, set the password 1357
3 Confirm operation
4 In the rESEt page, set YES
5 Confirm operation
to next measurement page
to previous measurement page
to sengs menu
to previous info page to next info page
increase a parameter value
decrease a parameter value
edit/conrm
to previous page to next page
9
EM24 E1 use
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpAEM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Step Action Button
6 In the EnE PrES page, set YES
7 Confirm operation
Setting a parameter
Example procedure: how to set Ct rAtio=20 and save changes.
Step Action Button
1 Power on the energy analyzer
2 Press the joystick for at least 3 seconds
3 In the PASS? page, select the correct password (default 0)
4 Confirm operation
5 Scroll pages until Ct rAtio
6 Enter the editing mode
7 Select 20
8 Confirm operation
9 Scroll pages until End to exit
10
EM24 E1 use
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Menu description
Measurement menu - measurement pages
The displayed pages depend on the application set.
Page Displayed measurements Description
1
L1-L2-L3
V
LNΣ
Hz
Phase sequence
System phase-neutral voltage
Frequency
2
L1-L2-L3
V
LLΣ
Hz
Phase sequence
System phase-phase voltage
Frequency
3
Tot kWh (+)
W
Σ
dmd
W
Σ
dmd max
Total imported active energy
System active power dmd
System active power dmd max
4
kWh
A dmd max
PArt
Active energy
Maximum dmd current
Partial active energy
5
Tot kvarh (+)
VA
Σ
dmd
VA
Σ
dmd max
Total imported reactive energy
System apparent power dmd
System apparent power dmd max
6
kvarh
VA
Σ
PArt
Reactive energy
System apparent power
Partial reactive energy
7
kWh (+)
t1
W
Σ
dmd
Imported active energy, tariff 1
System active power dmd
8
kWh (+)
t2
W
Σ
dmd
Imported active energy, tariff 2
System active power dmd
9
kWh (+)
t3
W
Σ
dmd
Imported active energy, tariff 3
System active power dmd
10
kWh (+)
t4
W
Σ
dmd
Imported active energy, tariff 4
System active power dmd
11
kvarh (+)
t1
W
Σ
dmd
Imported reactive energy, tariff 1
W
Σ
dmd
12
kvarh (+)
t2
W
Σ
dmd
Imported reactive energy, tariff 2
W
Σ
dmd
13
kvarh (+)
t3
W
Σ
dmd
Imported reactive energy, tariff 3
W
Σ
dmd
14
kvarh (+)
t4
W
Σ
dmd
Imported reactive energy, tariff 4
W
Σ
dmd
15
kWh (+) X
W X
User X
Imported active energy
Active power
User
16
kWh (+) Y
W Y
User Y
Imported active energy
Active power
User
17
kWh (+) Z
W Z
User Z
Imported active energy
Active power
User
18
Total kvarh (-)
VA
Σ
dmd
VA
Σ
dmd max
Total exported reactive energy
System apparent power dmd
System apparent power dmd max
19
Total kWh (-)
W
Σ
dmd
W
Σ
dmd max
Total exported active energy
System active power dmd
System active power dmd max
11
Congure the system
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpAEM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
20
Hours
W
Σ
PF
Σ
Total load operating hours
System active power
System power factor
21
Hours
VAr
Σ
PF
Σ
Total load operating hours
System reactive power
System power factor
22
var L1
var L2
var L3
Phase 1 reactive power
Phase 2 reactive power
Phase 3 reactive power
23
VA L1
VA L2
VA L3
Phase 1 apparent power
Phase 2 apparent power
Phase 3 apparent power
24
PF L1
PF L2
PF L3
Phase 1 power factor
Phase 2 power factor
Phase 3 power factor
25
W L1
W L2
W L3
Phase 1 active power
Phase 2 active power
Phase 3 active power
26
A L1
A L2
A L3
Phase 1 current
Phase 2 current
Phase 3 current
27
V L1-2
V L2-3
V L3-1
Phase 1-phase 2 voltage
Phase 2-phase 3 voltage
Phase 3-phase 1 voltage
28
V L1
V L2
V L3
Phase 1 voltage
Phase 2 voltage
Phase 3 voltage
Note: in programming mode, the last displayed page is stored.
Information Menu
Page Page title Information displayed
1 IP o.o.-.- IP address (first part)
2 IP -.-.o.o IP address (second part)
3 Sub o.o.-.- Subnet mask (first part)
4 Sub -.-.o.o Subnet mask (second part)
5 Gateo.o.-.- Default gateway (first part)
6 Gate-.-.o.o Default gateway (second part)
7 Port Modbus TCP port
8 DHCP DHCP enabling
9 Info Ethernet diagnostic
10 Ut ratio VT/PT ratio
11 CT ratio CT ratio
12
1P/2P/3P/3Pn
(2-3-4-wire)
dmd (time)
System
Connection (2-3-4-wire)
Dmd integration time (min.)
13 Pulse LED pulse weight (Number of kWh/kvarh per pulse)
14 Year
Firmware release
Year of production
12
Congure the system
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Settings from EM24 E1
General settings
The available settings depend on the application set.
Page title Sub-menu Description Values Default value
Cng PASS - Change password From 0 to 9999 0
APPLiCAt Application tYP.A
tYP.b
tYP.C
tYP.d
tYP.E
tYP.F
tYP.G
tYP.H
tYP.H
User USEr 1 User From 0 to 9999 1
USEr 2 From 0 to 9999 2
USEr 3 From 0 to 9999 3
dHCP - DHCP enabling oFF/on oFF
IP Addr IP o.-.-.- IP address From 000 to 255 192
IP -.o.-.- From 000 to 255 168
IP -.-.o.- From 000 to 255 1
IP -.-.-.o From 000 to 255 10
SUb SUb o.-.-.- Subnet mask From 000 to 255 255
SUb -.o.-.- From 000 to 255 255
SUb -.-.o.- From 000 to 255 255
SUb -.-.-.o From 000 to 255 0
GAtE GAtE o.-.-.- Default gateway From 000 to 255 192
GAtE -.o.-.- From 000 to 255 168
GAtE -.-.o.- From 000 to 255 1
GAtE -.-.-.o From 000 to 255 1
Port - MODBUS TCP port 502
SELECtor SELEC. 1 Page displayed according to selector
position among the available pages for
each application (see”Frontal selector”
on page 15)
From 1 to 28 1
SELEC. 2 From 1 to 28 25
SELEC. 3 From 1 to 28 28
SELEC.LoC From 1 to 28 3
SYS - System 3P.n
3P.1
2P
1P
3P
Note: MID (PFA, PFB): only 3P.n
3P.n
Ut rAtio - Voltage transformer ratio (VT) AV5: from 1 to 6975
AV2: N/A
1
Ct rAtio - Current transformer ratio (CT) AV5: from 1 to 6975
AV2: N/A
1
P int.ti - Dmd integration time (min) From 1 to 30 15
FiLtEr.S - Interval of lter intervention with respect
to full scale (%)
From 0 to 100 2
FiLtEr.Co - Filter coefcient From 1 to 32 2
End - Exit and save - -
Note: the Ut rAtio is available for compatibility with other versions, even though the AV5 version is not meant to be used with voltage transformers. It should
be therefore set to 1.
13
Essential information
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpAEM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Essential information
Measurement management
Applications
Note: if an application with easy connection is selected, for the calculation of the active energy the power is always integrated, both in the case of imported
and exported power . The current direction does not affect the measurement. If an application without easy connection is selected, both the active imported
and exported are available.
Application Measurements Easy connection
A
System:
phase sequence
phase-neutral voltage
frequency
total imported active energy
active power dmd and dmd max
YES
B
System:
phase sequence
phase-neutral voltage
frequency
total imported active energy
active power dmd and dmd max
total imported reactive energy
apparent power dmd and dmd max
YES
C
System:
phase sequence
phase-neutral voltage
frequency
total imported active energy
active power dmd and dmd max
imported active and reactive energy by tariff
YES
D
Single phase:
imported active energy
voltage
YES
E
System:
phase sequence
phase-neutral voltage
frequency
total imported and exported active energy
active power dmd and dmd max
run hour meter
active power
power factor
NO
F
System:
phase sequence
phase-neutral voltage
frequency
total imported and exported active energy
active power dmd and dmd max
phase-phase voltage
active energy
maximum dmd current
partial active energy
total imported and exported reactive energy
apparent power, dmd and dmd max
partial reactive energy
run hour meter
active power
power factor
NO
14
Essential information
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
G
System:
phase sequence
phase-neutral voltage
frequency
total imported active energy
active power dmd and dmd max
phase-phase voltage
active energy
maximum dmd current
partial active energy
total imported reactive energy
apparent power, dmd and dmd max
reactive energy
run hour meter
active power
active power dmd
reactive power
power factor
imported active and reactive energy by tariff
Single phase:
reactive power per phase
apparent power per phase
power factor per phase
active power per phase
current per phase
line-line voltages
line-neutral voltages
YES
H
System:
phase sequence
phase-neutral voltage
frequency
total imported and exported active energy
active power dmd and dmd max
phase-phase voltage
active energy
maximum dmd current
partial active energy
total imported and exported reactive energy
apparent power, dmd and dmd max
reactive energy
run hour meter
active power
active power dmd
reactive power
power factor
imported active and reactive energy by tariff
Single phase:
reactive power per phase
apparent power per phase
power factor per phase
active power per phase
current per phase
line-line voltages
line-neutral voltages
NO
Programming pages
The following table shows which programming pages are available for each application
Page Application
A B C D E F G H
Change password x x x x x x x x
Application x x x x x x x x
User - - - x - - - -
DHCP enabling x x x x x x x x
IP address x x x x x x x x
Subnet mask x x x x x x x x
Default gateway x x x x x x x x
MODBUS TCP port x x x x x x x x
15
Essential information
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpAEM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Selector x x x x x x x x
System x x x x x x x
VT ratio x x x x x x x x
CT ratio x x x x x x x x
Average power integration time x x x - x x x x
Filter S - - - - - x x x
Filter Co - - - - - x x x
End x x x x x x x x
Tariff management
Managing taris via Modbus command
Change the tariff by entering the value corresponding to the current tariff according to the following table in the 1201Fh registry:
Current
tariff
Register
value
T1 1
T2 2
T3 3
T4 4
Disabling tari management
Set tariff management as disabled or enter 0 (default value) in the 1201Fh register.
Frontal LED and selector
Frontal LED
The frontal red LED flashes proportionally to the active imported energy consumption if the selector is in - 1 - 2 position, and to the reactive inductive
energy consumption in kvarh
position. Any kind of negative (exported) energy will not be managed by the front LED.
Frontal selector
Lock position: the frontal selector prevents from accessing the programming mode
1, 2, kvarh
position: quick access to measuring pages. Each position is associated with one measuring page according to the following table:
Application Selector position Page available
A
Lock
3
1,2,3 1
B, C, E, F, G, H
Lock, 1, 2, kvarh
Can be set from 1 to 28
C
Lock, 1, 2, kvarh
Can be set from 1 to 28
D
Lock 28
1 15
2 16
3 17
16
Maintenance and disposal
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
Maintenance and disposal
Cleaning
Use a slightly dampened cloth to clean the display. Do not use abrasives or solvents.
Responsibility for disposal
The product must be disposed of at the relative recycling centers specified by the government or local public authorities. Correct disposal
and recycling will contribute to the prevention of potentially harmful consequences to the environment and persons.
EM24 E1 - Instruction manual | CARLO GAVAZZI Controls SpA
EM24 E1 - User manual
2018-06 | Copyright © 2018
CARLO GAVAZZI Controls SpA
via Safforze, 8
32100 Belluno (BL) Italy
www.gavazziautomation.com
info: +39 0437 355811
fax: +39 0437 355880
EM24 E1
Analizzatore di energia per sistemi trifase
MANUALE UTENTE
19EM24 E1 - Manuale utente | CARLO GAVAZZI Controls SpA
Sommario
EM24 E1 21
Introduzione 21
Descrizione 21
UCS (Universal Conguration Software) 21
Uso di EM24 E1 22
Introduzione 22
Display 22
Impostare i parametri di rete 23
Impostare i parametri di rete via DHCP 23
Impostare i parametri di rete senza DHCP 23
Operare nell’EM24 E1 24
Operare nel menu misure/info 24
Operare nel menuimpostazioni 24
Azzerare il contatore di energia parziale 24
Impostare un parametro 25
Descrizione dei manu 26
Menu misure- pagine di misura 26
Menu informazioni 27
Impostazioni da EM24 E1 28
Impostazioni generali 28
Cose da sapere 29
Applicazioni 29
Pagine di programmazione 30
Gestire le tarie tramite comando Modbus 31
Disabilitare la gestione tarie 31
LED frontale 31
Selettore frontale 31
Manutenzione e smaltimento 32
20 EM24 E1 - Manuale utente | CARLO GAVAZZI Controls SpA
Proprietà delle informazioni
Copyright © 2018, CARLO GAVAZZI Controls SpA
Tutti i diritti riservati in tutti i paesi.
CARLO GAVAZZI Controls SpA si riserva il diritto di apportare modifiche o miglioramenti alla relativa documentazione senza
obbligo di preavviso.
Messaggi di sicurezza
Di seguito le segnalazioni legate alla sicurezza dell’utilizzatore e dell’apparecchio contenute in questo documento:
AVVISO: indica obblighi che se non ottemperati possono causare danni all’apparecchio.
ATTENZIONE! Indica una situazione rischiosa che se non evitata, può causare la perdita di dati.
IMPORTANTE: offre indicazioni essenziali al completamento del compito che non devono essere trascurate.
Avvertenze generali
Questo manuale è parte integrante del prodotto e accompagna il prodotto per tutta la sua vita. Deve essere consultato per
tutte le situazioni legate alla configurazione, all’uso e alla manutenzione. Per questo motivo deve essere sempre accessibile
agli operatori.
AVVISO: nessuno è autorizzato ad aprire l’analizzatore. TSolo il personale dell’assistenza tecnica CARLO GAVAZZI può
farlo. La protezione può essere compromessa se lo strumento viene usato in un modo non specificato dal costruttore.
Assistenza e garanzia
In caso di malfunzionamento, guasto, necessità informazioni o per acquistare componenti contattare la filiale CARLO GAVAZZI o
il distributore nel paese di appartenenza.
L’installazione e l’uso dell’analizzatore diversi da quanto indicato nelle istruzioni fornite invalidano la garanzia.
Download
Questo manuale www.productselection.net/MANUALS/UK/EM24_im_use.pdf
Istruzioni per l’installazione - EM24 www.productselection.net/MANUALS/UK/EM24_im_inst.pdf
UCS software www.productselection.net/Download/UK/ucs.zip
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97

CARLO GAVAZZI EM24DINAV23XE1PFB Manuale utente

Tipo
Manuale utente