7
Installing Your SuperLine IAD
Before you install your SuperLine IAD, read the
Important Safety Instructions
on
page 27.
There are several ways to connect your SuperLine IAD, depending on your current
phone configuration, data needs (Internet), and future needs. You can connect any
combination of two phones, fax machines, or modems through your SuperLine IAD.
Any device connected to your SuperLine IAD must be FCC Part 68-registered for the
U.S. and Industry Canada CS-03-certified for use in Canada.
Connecting Multiple Phones, Fax Machines, or Modems to Your SuperLine
IAD
This procedure describes how to connect multiple phones, fax machines, or
modems to your SuperLine IAD (page 8).
Connecting a 2-Line Phone (with Existing Phone and One or Two Additional
Lines)
This procedure describes how to connect a 2-line phone to your SuperLine IAD if
you have ordered one or two additional lines with your SuperLine IAD (page 10).
Connecting 2-Line Phone (with Two Additional Lines)
This procedure describes how to connect a 2-line phone to your SuperLine IAD if
you have ordered two additional lines with your SuperLine IAD (page 12). You can
also connect the third line of a 3-line phone or an additional phone, fax machine, or
modem.
Connecting a Modem to Your SuperLine IAD
This procedure describes how to connect a modem through the PHONE 1/2 and
PHONE 2 jacks on your SuperLine IAD rear panel (page 14).
Optional Configuration
This procedure describes how to connect multiple phones, fax machines, or
modems in separate rooms (page 16). This configuration may not be applicable in
all homes or small offices.
High-Speed Data Service
This procedure describes how to connect your SuperLine IAD to a PC or Hub for
high-speed Internet services using the Ethernet port (page 18). This feature may
not be available in your area. Contact your local phone company for further
information.
Connecting Phone Filters to Your Existing Phones
This procedure describes how to connect a phone filter to your existing phones
(page 19).
Applying Power to the Unit
This section provides steps to apply power to your SuperLine IAD and verify its
proper operation (page 20).