6GB
FIXING THE FRAME
• Loosen the two screws fastening the lower chimney
and remove this from the lower frame.
• Loosen the two screws fastening the upper
chimney and remove this from the upper frame.
If you wish to adjust the height of the frame, proceed
as follows:
• Unfasten the eight metric screws joining the two
columns, located at the sides of the frame.
• Adjust the frame to the height required, then
replace all the screws removed as above.
• Insert the upper chimney stack from above, and
leave it running free on the frame.
• Lift up the frame, fit the frame slots onto the screws
up to the slot end positions.
• Tighten the two screws and fasten the other two
screws provided with the hood.
Before tightening the screws completely it is possible to
adjust the frame by turning it. Make sure that the screws
do not come out of their seats in the slotted holes.
• The frame mountings must be secure to withstand the weight of the hood and any stresses caused
by the occasional side thrust applied to the device.
On completion, check that the base is stable, even if the frame is subjected to bending.
• In all cases where the ceiling is not strong enough at the suspension point, the installer must
provide strengthening using suitable plates and backing pieces anchored to the structurally sound
parts.
Connections
DUCTED VERSION AIR EXHAUST SYSTEM
When installing the ducted version, connect the hood to the chimney using either a flexible or rigid
pipe ø 150 or 120 mm, the choice of which is left to the installer.
• To install a ø 120 mm air exhaust connection, insert
the reducer flange 9 on the hood body outlet.
• Fix the pipe using the pipe clamps 25 provided.
• Remove any activated charcoal filters.
RECIRCULATION VERSION AIR OUTLET
• Fix the connection 15 to the frame using the 4 screws
provided.
• Fix the flange 10 to the lower opening of the
connection 15.
• Connect the hood air outlet to the flange in the
lower part of the junction using a rigid or flexible
ø 150 tube (by installer’s choice).