Alpha FlowSmart Guida d'installazione

Tipo
Guida d'installazione
18 litres/minute from
a combi?
FlowSmart.
A step-by-step installation guide.
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5 STEP 6
Using a spirit level, tape the GasSaver and
PremierPack templates to wall. Mark all positions as
indicated on wall, drill holes and add rawlplugs. Mark
flue position and drill hole.
Screw PremierPack, GasSaver hanging bracket and
top fixing bolt assembly to wall.The boiler and
GasSaver can now be simply hung whenever you are
ready.
Drill hole in wall and push Expansion Relief Valve pipe
through. Pull back so that the rubber grommet
completes a seal, mark off and cut to required length.
Remove tails from boiler and screw to PremierPack.
Measure, cut, bend and fit GasSaver mains inlet/outlet
pipework to PremierPack using the pipe clip plate.
Complete any other necessary pipework and fit using
pipe clips where required.
Complete an
y solder
ing that is necessary Position thermal store where required, and fit
washers plus tails to connections shown on pipework
label on top of store
The perfect combination
18 steps to 18 litres/minute
FlowSmart system v 200L unvented cylinder at flow rate 18 litres/minute
T
ime (minutes)
Te m p °C at flow rate 18L/min
D
HW output °C
200L unvented cylinder
D
HW output °C
F
lowSmart 25L store
80
70
60
5
0
40
3
0
20
1
0
0
2 4 6 8 10 12 14 16 18 20
D
HW output °C
F
lowSmart 50L store
FlowSmart system v 200L unvented cylinder at flow rate 18 litres/minute
Its thermal store recharges in just 5-7
minutes, compared to the 45 minutes a
200 litre cylinder can take to replenish
from empty.
The small thermal store takes up much
less space than a cylinder, enabling
FlowSmart to be more easily sited. If
required, the entire system can even be
installed together in a cupboard.
This, along with a limited pipework
requirement, means installation of
FlowSmart is also quicker and simpler.
25
%
L
ESS GAS USED*
F
lowSmart uses up to 25% less gas to provide DHW than a system boiler with a 200 litre unvented store
a
nd consumes less electricity.
By incorporating a GasSaver and small thermal store, FlowSmart allows a combi boiler to deliver a flow rate of 18
litres of hot water per minute, at 50ºC or above, for up to 30 minutes – more than three times longer than a typical
system boiler set-up.Together with its superior energy efficiency and ease of installation, this makes FlowSmart the
perfect combination.
STEP 10 STEP 11 STEP 12
STEP 13 STEP 14 STEP 15
STEP 16 STEP 17 STEP 18
Lift boiler on to PremierPack and fasten connections
from PremierPack to boiler.
Fit GasSaver flue clamp and lower GasSaver on to
flue turret. Secure GasSaver using top fixing bolts and
adjust to lev
el.Tighten screws on GasSaver flue
turret.
Connect the pipework to GasSaver and fit flue pipe.
P
osition and f
it junction bo
x,
fuse spur, 2-channel
timer and room thermostat.
Remo
v
e ther
mal store ther
mostat panel. Cut
insulation material as required and remove. Wire up
cylinder thermostat and fit into cut hole and secure
using the fastening supplied.
Lo
w
er boiler control panel and remo
v
e terminal
block cover. Replace 3-core power chord with 4-core
cab
le to pro
vide a switched liv
e connection at
ter
minal one
.
Replace terminal block and cover, push control panel
back into place and screw do
wn.
Fit pipe co
v
er tray
to complete installation.
Adjust all settings on controls, thermostats and timers
according to installation instr
uctions and homeo
wner’
s
requirements.
Commission the system,
carefull
y
following the commissioning guidelines provided.
Completed installation.
STEP 7
STEP 8
STEP 9
Install blending valve between mains water supply
and hot outlet of thermal store.The blended outlet
connects to the boiler cold water inlet.
Fit expansion vessel to primary return pipe of
thermal store, using the compression T-piece
provided.
Fit Y-Plan mid position valve to primary flow, thermal
store primary inlet connection and heating circuit.
The complete system solution
F
or further information call us on 01732 783000
or visit www.alpha-innovation.co.uk
Nepicar House, London Road,Wrotham Heath, Kent TN15 7RS
*T
est data assessed by TUV NEL Ltd
CD35C boiler
A
compact SEDBUK ‘A’ rated
c
ondensing boiler with fully-modulating
o
utput of up to 35kW.
GasSaver
C
aptures and stores heat from boiler
f
lue gases, using it to pre-heat cold mains
w
ater before it enters the boiler.
Thermal store
U
ses heat from the primary system to
f
urther raise the temperature of the
w
ater pre-heated by the GasSaver.
What’s included
How FlowSmart works
When there is a demand for DHW, mains cold water flows into the GasSaver, where its temperature is raised using
heat reclaimed from boiler flue gases.
Cold Water Inlet
Cold Water Outlet
DHW Outlet
Flow Rate 18L/min
GasSaver
CD35C
Combi
60˚C and below
80˚C and below
30˚C
55˚C
Blending Valve
25L or 50L
Primary Store
Flow
Return
This pre-heated water then passes
through a copper coil heat exchanger in
the thermal store, where it is heated
further by surrounding hot water from
the primar
y system.
The water then passes thr
ough a
blending valve, where it is controlled to
30ºC, before entering the boiler.
With less work to do to raise the
water’s temperature, the boiler is able
to satisfy heavy DHW demands for long
periods, without detrimental effect to
flow rate.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Alpha FlowSmart Guida d'installazione

Tipo
Guida d'installazione

in altre lingue